According to Indian Standards Institute the actual size of modular bricks is 19 x 9 cm x 9 cm.
The measurement is made for stone work in square metre in case of – Wall facing, Dressed stones in Chajjas
The slope of the outlet of ‘P trap’ below the horizontal is kept – 14°
According to IS method of measurement, the order of the sequence is – Length, Breadth, Height
The area is measured correct to the nearest – 0.01 sq m
The main factors to be considered while preparing a detailed estimate are – 1.Quantity of the materials, 2.Availability of materials, 3.Transportation of materials, 4.Location of site and local labour charges.
The brick work is measured in sq metre in case of – 1.Honey comb brick work, 2.Brick flat soling, 3.Half brick walls or the partition
The damp proof course (D.P.C) is measured in – Sq. m
Brick walls are measured in Sq. m if the thickness of the wall is 20 cm.
Cost of fittings and their fixing is specified for the sanitary fittings — Water closets, Flushing pipes, Laboratory, basins, Sinks
In case of laying gullies, siphons, intercepting traps, the cost includes – Setting and laying, Bed concreting, Connection to drains
In long and Short wall method of estimation the length of long wall is the centre to centre distance between the walls and – half breadth of wall on each side.
The earth work of cutting in trenches or borrow pits in fairly uniform ground is measured with the help of average depths of the dead men.
The earth work in trenches or borrow pits in irregular ground is measured taking the difference in levels before and after completion of work.
The height of the sink of wash basin above floor level is kept – 75 cm to 80 cm
Carpet area does not include the area of – 1.The walls along with doors and other openings, 2.Corridor and passage, 3.Bath room and lavatory, 4.Kitchen and pantry
The concrete work for the part of the building of specified thickness is measured in square metres – Root slabs, Floors, D.P.c, Wall panels
The expected out turn for earth work in excavation in ordinary soil per labour per day is 3.00 cum.
Antisiphonage pipe is connected to – Top of P trap
The estimated value of the work excluding the amount for contingencies, work charged establishment tool and plants is called work value.
The actual expenditure involved to complete a work including incidental, establishment and travelling charges is called Actual cost
The formal acceptance by the administrative department for incurring an expenditure on the work is called Administrative approval.
The order of a competent authority sanctioning a properly detailed estimate of the cost of a work of construction or repair is called Technical sanction.
The expected out turn of cement concrete 1 : 2 : 4 per mason per day is 5.0 m³.
The rate of payment is made for 100 cu m (per % cu m) in case of – Earth work in excavation, Rock cutting, Excavation in trenches for foundation, Earth work in filling the plinth.
The plinth area of a building not includes the area of cantilevered porch.
The minimum width of a septic tank is taken – 75 cm
Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil.
The lead is calculated for each block of the excavated area.
The unit of lead is 50 m for a distance up to 500 m.
Pointing, Plastering, Glazing and Striking are measured in sq.m.
The item of the brick structure measured in sq.m is – Broken glass coping
Bends are provided in canals if these are partly in excavation and partly in embankment.
The items of steel work which are measured in sq.m are Collapsible gates, Rolling shutters, Steel doors, Ventilators and Glazing.
If the formation level of a highway has a uniform gradient for a particular length and the ground is also having a longitudinal slope the earthwork may be calculated by – 1. Mid-section formula, 2.Trapezoidal formula, 3.Prism0idal formula
The most reliable estimate is – Detailed estimate
The volume is measured correct to the nearest 0.01 cum.
Cement is paid per 50 kg bag.
Lime is paid per quintal.
Brick aggregates are paid per cum.
The earth work is not measured separately in – Setting out of works, Site clearance, Dead men, Steps in deep excavation
Pipes laid in trenches and pipes fixed to walls are measured separately.
Cutting through walls and floors are included with the item.
Pipes are classified according to their sizes and quality.
In laying pipes the method of Jointing and fixing is specifically specified.
The earthwork calculation in excavation is made from the difference in levels obtained with a level.
The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers.
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm is termed as – Surface excavation
The unit of measurement is per quintal for the M.S reinforcement of R.C.C works.
The gully trap collects waste water from the kitchen, sink, wash basins. etc.
Due to change in price level a revised estimate is prepared if the sanctioned estimate exceeds – 8.0%
The brick work is not measured in cu. m in case of – Half brick wall
In the mid-section formula – 1.The mean depth is the average of depths of two consecutive sections, 2.The area of mid-sections is calculated by using mean depth, 3.The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two sections.
The detention period in a septic tank is assumed as 30 minutes.
The ‘centre line method’ is specially adopted for estimating – Circular buildings, Hexagonal buildings, Octagonal buildings, Other geometrical shaped buildings
As per Indian Standard Specifications the peak discharge for domestic purposes per capita per minute is taken – 1.80 litres for 5 to 10 users, 1.20 litres for 15 users, 1.35 for 20 users.
The item of work not included in the plinth area estimate is courtyard area.
The items whose weight is added to the weight of respective items are – Cleats, Brackets, Bolts, Distance Separators
The bent up bars at a support resist the negative bending moment and the sharing force.
The bending of bars near supports is generally at 45°.
The usable covered area of the rooms of any storey of a building is called carpet area.
The carpet area of a building along with area of its kitchen, pantry, store, called floor area.
The expected out turn of half brick partition wall per mason per day is 2.0 m³.
The floor area includes the area of the balcony up to 50%.
The built up covered area at the floor level of any storey of a building is called plinth area.
The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate are called contingencies.
Additional supervising staff engaged at work site is called work charged establishment.
Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item.
The cost per unit at which the article can be procured from the open market at a given time is catted ‘Market rate’.
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day is 1.25 m³.
The F.S.L. is above N.S.L. the canal is caned partly in cutting and partly in filling.
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended – 150 mm
The weight of an item is measured correct to nearest – 1.00 kg
All pipes and fittings are classified according to their diameters.
The diameter of the pipe is the normal diameter of internal bore.
The trap which is provided to disconnect the house drain from the street sewer is called – Master trap, Intercepting trap, Interception manhole, Interceptor chamber.
The rate of an item of work depends on – Specifications of Works, Specifications of materials, Proportion of mortar, Method of construction
While preparing a detailed estimate – 1.Dimension should be measured correct to 001 m, 2.Area should be measured correct to 0.01 sq. m
All pipes are measured along the centre line of the pipes in metres.